Sweden - Malmö City Tunnel

MJK delivered a wired SCADA system (RS 485 transmission) to monitor the ground water level at the construction site for the building of the new railway tunnel below Malmö city centre.

The projects included 150 level transmitters in separate bore holes and a similar number of VFDs and pumps. Everything was monitored and controlled by MJK equipment to keep the required ground water level during the entire construction period.

 

 

 

 

MJK Automation: Company Profile > Case references > Malmö City Tunnel